Title Heliostat field cleaning scheduling for Solar Power Tower plants: A heuristic approach
Authors ASHLEY, THOMAS IAN, FERNÁNDEZ CARA, ENRIQUE , CARRIZOSA PRIEGO, EMILIO
External publication Si
Means Appl. Energy
Scope Article
Nature Científica
JCR Quartile 1
SJR Quartile 1
JCR Impact 8.84800
SJR Impact 3.60700
Publication date 01/01/2019
ISI 000458942800054
DOI 10.1016/j.apenergy.2018.11.004
Abstract Soiling of heliostat surfaces due to local climate has a direct impact on their optical efficiency and therefore a direct impact on the productivity of the Solar Power Tower plant. Cleaning techniques applied are dependent on plant construction and current schedules are normally developed considering heliostat layout patterns, providing sub-optimal results. In this paper, a method to optimise cleaning schedules is developed, with the objective of maximising energy generated by the plant First, an algorithm finds a cleaning schedule by solving an integer program, which is then used as a starting solution in an exchange heuristic. Since the optimisation problems are of large size, a p-median type heuristic is performed to reduce the problem dimensionality by clustering heliostats into groups to be cleaned in the same period.
Keywords Solar energy; Routing problems; Scheduling; Cluster analysis
Universidad Loyola members